The Fire May Be Contained. The Loss Usually Isn't.
Commercial fire losses extend far beyond the area of origin. Atlas develops detailed scopes for fire, smoke, water, demolition, code-related work, and reconstruction, organized around the way the building actually has to be restored.
A commercial fire is the burned area, plus everywhere the smoke went, plus the sprinkler discharge. Atlas documents it by system, writes rated assemblies back to their rating, separates shell and core from each tenant's improvements, and carries the sprinkler, alarm, and emergency lighting work that has to be tested and signed off before occupancy, all from a measured sketch in Xactimate®. Where the fire marshal's findings or an engineer's report define the structural repair, Atlas writes from them.
A commercial fire rebuild at permit brings rated assemblies, alarm, suppression, egress, door hardware, and accessibility to current requirement. Each upgrade over like-for-like is written on its own line.
The rebuild written by system, top down and trade by trade: shell and core separated from each tenant's improvements, rated assemblies back to their rating, the ceiling cavities and ductwork the smoke traveled through, and sprinkler, alarm, and emergency lighting recommissioning with their testing. Photo report by area and by suite. Measured sketch.